Quality control
-Standard certificate
1*EN10204 TYPE3.1B certificate,including material analysis with traceable heat number or batch number,pressure test,dimension checking,surface checking
2*Photos or videos of each step can be provided
-Optional reports
1*NDE test
=MT(Magnetic Particle Test)
=UT(Ultrasonic Test)
=RT(X-Ray Radiograph Test)
=PT(Dye Penetrate Test)
2*Mechanical and Chemical test
=PMI(Spark emission/Carbon analyzer method optional)
=Yield/Tensile strength
=Hardness test
=Charpy Impact test
=Metallographic analysis
3*Corrosion test
=IGC(Inter-granular Corrosion) test per A262
=Pitting corrosion test per G48
4*3-rd party inspection(TPI) approval
5*3.2 certificate approval
6*ISO15848-1/2 or TA-LUFT or API624 fugitive emission test
7*API607/6FA fire safe test
8*Cryogenic test
9*Other test as per requests
Steel Valve
Iron Valve
Fittings and Accessaries